You are here: Home » News » Company News » Rockbreaker Boom System Met The Testing Requirements Of YZH Factory

Rockbreaker Boom System Met The Testing Requirements Of YZH Factory

Views: 5     Author: Site Editor     Publish Time: 2020-03-14      Origin: Site

We all know that the equipment must be inspected and debugged before leaving factory. The main purpose is to check the quality of the equipment is qualified. YZH rockbreaker boom system shall also pass the factory inspection, meet the standards and ISO9001 quality system standards, and then rockbreaker boom system can be delivered.

The main inspection items of the rockbreaker boom system include:
1. Appearance inspection.
2. Assembly quality inspection.
3. Mechanical characteristics and mechanical operation experiments.
4. Anti-misoperation performance check.
5. Power-on action experiment.
6. Main loop resistance measurement.
7. Power frequency withstand voltage test.
8. Equipment performance and running stability inspection.
9. Electrical system inspection.
10. Inspection of finished product identification.
11. Inspection of finished product package.

All rockbreaker boom systems have to pass strict inspection before they go out. No one can match us so far as quality!

Rockbreaker Boom System Met The Testing Requirements Of YZH Factory

Rockbreaker Boom System Met The Testing Requirements Of YZH Factory-2

  • E-mail: yzh@breakerboomsystem.com
  • Phone: +86-15610128027
  • Fax: +86-534-5987030
  • Company: Jinan YZH Machinery Equipment Co., Ltd
  • Office Add: No. 73, Huaicun Street, Huaiyin District, Jinan City, Shandong Province, China.
  • Factory Add: Qihe Economic Development Zone, Dezhou City, Shandong Province, China.
Leave a Message
Contact us