You are here: Home » News » Industry News » Seasonal Operation Tips for Stationary Rock Breaker Boom System

Seasonal Operation Tips for Stationary Rock Breaker Boom System

Views: 0     Author: Site Editor     Publish Time: 2025-06-25      Origin: Site

Seasonal Operation Tips for Stationary Rock Breaker Boom System


Stationary rock breaker boom system is used in a wide range of environments—from hot desert quarries to sub-zero open-pit mines. Extreme temperatures can affect hydraulic performance, component wear, and overall system reliability. Adapting your operation to the season ensures safe, efficient, and uninterrupted performance year-round.


Operating in Cold Weather (Below 0°C / 32°F)

1. Preheat Hydraulic Oil

In low temperatures, hydraulic oil thickens and flows slowly. Use oil heaters or cycle the system gently for a few minutes before full operation to avoid damage from restricted flow.

2. Use Low-Temperature Hydraulic Oil

Switch to winter-grade hydraulic oil with the correct viscosity rating. Check with your manufacturer for approved alternatives.

3. Protect Rubber Components

Cold temperatures can cause seals and hoses to become brittle. Inspect them frequently for cracks or stiffness, and store spare parts in a temperature-controlled space.

4. Avoid Sudden Movements

Allow the boom and breaker to warm up before full-speed operation. Avoid abrupt motions until all joints and cylinders are at working temperature.

5. Operating in Hot Weather (Above 35°C / 95°F)

Monitor Oil Temperature

High temperatures can reduce the viscosity of hydraulic fluid, causing overheating or loss of pressure. Install temperature sensors if not already equipped.

6. Clean Cooling Systems

Ensure that fans, radiators, and oil coolers are free of dust and debris. Clogged systems can cause rapid overheating and reduced efficiency.

7. Check for Oil Evaporation

In extreme heat, oil levels may drop more quickly. Regularly monitor reservoir levels and check for leaks around fittings.

8. Adjust Operating Schedules

In very hot environments, consider scheduling heavy use for early morning or late afternoon, avoiding peak midday temperatures.


General All-Season Tips

1. Keep a Maintenance Log: Note seasonal changes in system performance or pressure readings.

2. Train Operators on Seasonal Behavior: Ensure all users understand how climate affects operation.

3. Review Manufacturer Guidelines: Some systems have specific recommendations for fluid type, torque settings, and component tolerances based on temperature.


Stationary rock breaker boom system is a long-term investment, and adapting your usage to seasonal conditions is key to maximizing uptime and protecting components. Whether in freezing winters or scorching summers, proper preparation makes all the difference.


pedestal boomboom systempedestal boom system

 Jinan YZH Machinery Equipment Co., Ltd
ABOUT COMPANY
Since 2002, YZH has specialized in providing custom pedestal rockbreaker boom systems for mines and quarries worldwide. We combine 20+ years of engineering expertise with rigorous CE-certified quality to boost your productivity and safety through superior design. We don't just sell equipment,we deliver a partnership built on problem-solving.​​​​​​​
CONTACT INFO
Do you want to become our customer?
E-mail: yzh@breakerboomsystem.com
WhatsApp: +861561012802​​​​​​​7
Tel: +86-531-85962369 
Fax: +86-534-5987030
Office Add: Room 1520-1521, Building 3, Yunquan Center, High & New Tech Development Zone, Jinan City, Shandong Province, China.
© Copyright 2025 Jinan YZH Machinery Equipment Co., Ltd . All Rights Reserved.  Privacy Policy  Sitemap   Technical Support:sdzhidian